151 - Create/Update/Delete resource planned to operation
From Host
This transaction is used to maintain resources planned to the operation
| Field | Description | Data Type | Mandatory | Comment |
|---|---|---|---|---|
| 1 | Delete | Logical | If true the resource planned to the operation is marked as deleted. | |
| 2 | Order ID | Text | Unique identification of the operation. | |
| 3 | Operation ID | Text | Unique identification of the operation. | |
| 4 | Operation resource ID | Text | This field should only be used in connection with the Aspect/4 Industrial integration. In other cases the field should be equal to field 6. | |
| 5 | Description | Text | If empty the description is taken from the resource. | |
| 6 | Resource ID | Text | The identification of the resource. The resource must belong to the work center of the operation. | |
| 7 | Pseudo Condition ID | Text | This field is used to change condition on the planned resource. Pseudo conditions are described in section 0 | |
| 8 | MRP Specific 1 | Text | The field is used in connection with the Aspect/4 Industrial interface. | |
| 9 | MRP Specific 2 | Text | Reserved for future used. | |
| 10 | MRP Specific 3 | Text | Reserved for future used. | |
| 11 | Barcode | Text |