138 - Create/Delete operation workload

From Host

The workload is used in ProManagement Job, when employees are assigned to operations. The purpose of the workload is to define how many hours in a period of time that must be manned on the specific operation.
Before sending the individual workloads, the whole workload should be deleted by sending a transaction with Order ID, Operation ID and ''Delete workload'' true/yes.

FieldDescriptionData TypeMandatoryComment
1Order IDTextX

Unique ID of order

2Operation IDTextX

Unique ID of operation

3Relative Load StartTime duration(X)

The start time relative to the planned start time of the operation.

See Note 1

4Load Start DateDate(X)

Start date of load period

See Note 1

5Load Start TimeTime

Start time of load period

6Load DurationTime duration

Duration of load period. Default value is one day (24 hours).

See Note 2

7Load End DateDate

End date of load period.

See Note 2

8Load End TimeTime

End time of load period.

See Note 2

9WorkloadTime duration

The number of hours that should be manned.

10Delete workloadLogical(X)

Delete all the workload records of the operation.

See Note 1

Notes

IdText
1Field 3 cannot be used in connection with field 4, but one of them must be included except if field 10 is Yes.
2Field 6 cannot be used in connection with field 7 and 8. If none of the fields are filled out a load duration of 24 hours is used. If field 7 is used and field 8 is not, then 23:59:59 is used as the default value for field 8.